Parkwind Signs MHI Vestas Offshore Wind for Arcadis Ost 1 in Germany

November 26, 2019
Copenhagen, Denmark

MHI Vestas to supply 27 V174-9.5 MW turbines for the 257 MW Baltic Sea project.

In a signing ceremony today in Copenhagen, MHI Vestas and Parkwind have signed a conditional agreement for turbine supply for Arcadis Ost 1 in the German Baltic Sea.

The signing is the first conditional contract for MHI Vestas to feature the V174-9.5 MW turbine.

“We are exceptionally pleased to be chosen by Parkwind once again for such a milestone project,” said Henrik Jensen, MHI Vestas Chief Sales Officer. “Today’s announcement is a testament to the strong partnership and trust between Parkwind and MHI Vestas as we embark on our fifth project together. We look forward to bringing our technology and experience to bear at Arcadis Ost 1 and contributing to the German renewable energy transition.”

As a result of the challenging soil conditions at the Arcadis Ost 1 site, Parkwind, MHI Vestas, and Heerema Marine Contractors have jointly developed a floating installation method – the result of a year-long collaborative process between the three partners.

The innovative installation methodology promises to contribute to further cost reduction in the industry and unlock the potential of many offshore areas around the world with challenging soil conditions.

The project, scheduled for a late 2022 installation, is located 20 km northeast of the island of Rugen, and will supply enough green power for 300,000 German homes.

-end-

For further information contact:
Michael Morris
MHI Vestas Offshore Wind
T: +45 8844 8950
mijmo@mhivestasoffshore.com

About MHI Vestas Offshore Wind
MHI Vestas Offshore Wind is a joint venture between Vestas Wind Systems A/S 50% and Mitsubishi Heavy Industries (MHI) 50%. The company’s focus is to design, manufacture, install and service wind turbines for the offshore wind industry. The company aims to create sustainable value through offshore wind power by driving capital and operating savings and increasing the power output of wind turbines. An innovative force in offshore wind since its inception in 2014, the company is guided by its founding principles of collaboration, trust, technology and commitment. For more information, see www.mhivestasoffshore.com or follow @MHIVestas on Twitter.

About Parkwind
With over 10 years of experience in developing, financing and operating wind farms, Parkwind has established a unique position in the industry.  With already 552 MW under operational management, Parkwind is determined to continue increasing the share of green energy through its collaborative approach with local communities, governments and suppliers.  While currently installing another 219 MW in the North Sea, Parkwind’s expanding international presence includes the 257 MW Arcadis Ost I project in Germany and the 330 MW Oriel Windfarm project in Ireland.  Applying new technologies, innovative design solutions and installations techniques, Parkwind ensures the transition to green energy respects the environment as well as all the stakeholders. Composed of over 90 professionals operating from offices in Belgium and Ireland, Parkwind consolidates all offshore wind energy activities of its Belgian shareholders: the Colruyt Group, Korys and PMV.

2019-11-26T13:50:32+00:00